What's First Article Inspection Program?

YADA First Article Inspection Program
YADA Production Department is responsible for identifying or submitting goods for production for first article inspection, which is performed as a verification of job readiness by inspecting the first article of a product as it is made. 

Regardless of when the inspection is performed (including, for example, the initial run of a job, material changes, job modifications, and periods of severe interruption between runs), the first article inspection must be performed to verify the readiness of the job. 

The person in charge of production carries out the first inspection and records it on the relevant "first inspection sheet", and after the first inspection is passed, the production department can arrange normal production.

The person in charge of the production of the first inspection items with reference to the "first inspection sheet" of the project inspection, the first inspection found unqualified, need to be in the "first inspection record sheet" corresponding to the project box to draw "x". At the same time the relevant departments to take corrective measures and re-confirmation of qualified, the person in charge of production should be in the corresponding re-inspection of the first piece of writing "re-inspection" as a re-inspection mark.